Single task test mode for integrated test launch system of active duty launch vehicle has been unable to meet the needs of the high density, designed a set of test launch and control system that testing for multiple rocket system at the same time, and improved the efficiency of the test. To design a system from the organization of test procedures, the plan of information flow, end checksum of test scheduling and so on, analyzed the preconditions and benefits of parallel testing.